Refer SAP Note 16083 - Standard jobs, reorganization jobs
Job | Job Info | In my system | As per SAP Note |
SAP_REORG_JOBS | Deletes old background jobs | Present and scheduled at 04:15:00 | Need to schedule daily with Variant yes |
SAP_REORG_SPOOL | Deletes old spool data | Present and scheduled at 03:30:00 | Need to schedule daily with Variant yes |
SAP_REORG_BATCHINPUT | Deletes old batch input sessions | Present and scheduled at 04:15:00 | Need to schedule daily with Variant yes |
SAP_REORG_ABAPDUMPS | Deletes old ABAP short dumps | Present and scheduled at 03:00:00 | Need to schedule daily with Variant yes |
SAP_REORG_JOBSTATISTIC | Deletes old data from the job runtime statistics | Not present and not scheduled | Need to schedule monthly with Variant yes |
SAP_COLLECTOR_FOR_JOBSTATISTIC | Generates runtime statistics for background jobs | Not present and not scheduled | Need to schedule daily |
SAP_COLLECTOR_FOR_PERFMONITOR | Collects data for the performance monitor | Present and scheduled | Need to schedule hourly |
SAP_CCMS_MONI_BATCH_DP | Dispatches monitoring architecture methods | Present and scheduled | Need to schedule hourly |
Below are recommended as per sap note and http://help.sap.com/saphelp_nw70/helpdata/en/24/b884388b81ea55e10000009b38f842/frameset.htm but not scheduled by me.
SAP_REORG_UPDATERECORDS | Deletes old update requests |
|
|
SAP_SPOOL_CONSISTENCY_CHECK |
| Not present and not scheduled | Need to schedule daily with Variant yes |
SAP_REORG_PRIPARAMS |
|
| Need to schedule monthly |
SAP_REORG_ORPHANED_JOBLOGS |
| Not present and not scheduled | Need to schedule weekly with Variant yes |
SAP_CHECK_ACTIVE_JOBS |
| Not present and not scheduled | Need to schedule hourly with Variant yes |
SAP_DELETE_ORPHANED_IVARIS |
| Not present and not scheduled | Need to schedule weekly with Variant ja |
SAP_REORG_ORPHANED_TEMSE_FILES |
| Not present and not scheduled | Need to schedule weekly with Variant ja |
SAP_CCMS_MONI_BATCH_DP is not a reorganization job but is needed to start tools / methods in the system monitoring area in the background -> transaction RZ20/RZ21.
3 comments:
Hello,
How do i know about the schedule of SAP Standard jobs in our system.
Regards,
Ahmad
Hello,
How do i know about the schedule of SAP Standard jobs in our system.
Regards,
Ahmad
Hi Ahmad,
You can check using SM37 which jobs are scheduled.
Regards,
Nikunj Thaker
Post a Comment